Time Entry Transformation
Welcome to the Time Entry Transformation project website, your central hub for staying informed about time entry transformation. On this site, you can access the latest updates, track the project timeline, and sign up to receive email updates through a subscription to GovDelivery. Explore our resources, including answers to frequently asked questions, key dates, and information on who's listening to your feedback. Whether you have questions or want to stay up to date, this site is designed to keep you connected and engaged with Time Entry Transformation.
Welcome to the Time Entry Transformation project website, your central hub for staying informed about time entry transformation. On this site, you can access the latest updates, track the project timeline, and sign up to receive email updates through a subscription to GovDelivery. Explore our resources, including answers to frequently asked questions, key dates, and information on who's listening to your feedback. Whether you have questions or want to stay up to date, this site is designed to keep you connected and engaged with Time Entry Transformation.
- Updates and Training
- Suggestion Box
- Surveys
- Questions
- Your Time Entry Tool Experience Feedback Needed
-
Sprint Wins July 2025
Share Sprint Wins July 2025 on Facebook Share Sprint Wins July 2025 on X (formerly Twitter) Share Sprint Wins July 2025 on Linkedin Email Sprint Wins July 2025 linkThe Time Entry Transformation team is making progress. Below are a few of the most recent wins and points of celebration. Thank you to everyone who has participated along the way.
•Completed first systems development life cycle flow to completion for Log In by Selecting a Database including functional QA, accessibility, and product manager testing.
•Created training plan with documents started for Access, Log In, Log Out, and Create & Save New Time Record.
•Started UAT process plan mapping with pilot and release management conversations to ramp up to our goal of a full statewide rollout by Fall 2025.
•The UAT environment build is complete and accessible with a test user ID.
•Usability testing plan created and demonstrated scenarios to test in the field with local agency workers using both dev and Figma prototypes.
•Legal language finalized and signed off on for various components (log-in disclaimer, website privacy policy, warning not to enter PHI or PII in case note field, UAT testing instructions).
•Finalized the operational support agreement for the CRM ticketing process with SSIS Help Desk requests for technical support on DCYF Tier 1, MNIT Tier 2 and Tier 3 teams.
•Training Environment build complete and infrastructure in place for the SSIS Learning and Development Team (staff access will be granted next).
•Visited 3 county agencies on-site (Stearns, Hennepin, Olmsted) and in the field to conduct usability testing, baseline measurements through Time-Motion studies, inform case worker personas, and collect feedback for design refinement.
•Presented to the county-led TCM Systems Changes workgroup on survey analysis and database changes for the Service Activities (in the Activity dropdown), and the MVP2 activity log original design to a refined prototype walk-through.
The Time Entry Transformation team is making progress. Below are a few of the most recent wins and points of celebration. Thank you to everyone who has participated along the way.
•Completed first systems development life cycle flow to completion for Log In by Selecting a Database including functional QA, accessibility, and product manager testing.
•Created training plan with documents started for Access, Log In, Log Out, and Create & Save New Time Record.
•Started UAT process plan mapping with pilot and release management conversations to ramp up to our goal of a full statewide rollout by Fall 2025.
•The UAT environment build is complete and accessible with a test user ID.
•Usability testing plan created and demonstrated scenarios to test in the field with local agency workers using both dev and Figma prototypes.
•Legal language finalized and signed off on for various components (log-in disclaimer, website privacy policy, warning not to enter PHI or PII in case note field, UAT testing instructions).
•Finalized the operational support agreement for the CRM ticketing process with SSIS Help Desk requests for technical support on DCYF Tier 1, MNIT Tier 2 and Tier 3 teams.
•Training Environment build complete and infrastructure in place for the SSIS Learning and Development Team (staff access will be granted next).
•Visited 3 county agencies on-site (Stearns, Hennepin, Olmsted) and in the field to conduct usability testing, baseline measurements through Time-Motion studies, inform case worker personas, and collect feedback for design refinement.
•Presented to the county-led TCM Systems Changes workgroup on survey analysis and database changes for the Service Activities (in the Activity dropdown), and the MVP2 activity log original design to a refined prototype walk-through.
-
Sprint 7 Review
Share Sprint 7 Review on Facebook Share Sprint 7 Review on X (formerly Twitter) Share Sprint 7 Review on Linkedin Email Sprint 7 Review linkSprint 7 Goal (6/18/25 - 7/1/25):
•Finalize AC2 code, team focus on the build (login, create new time record, save time record, logout) completed and ready for QA testing. Set up UAT domain and ensure it can be accessed with a test ID.
•Actual: Login with selecting a database and logout are completed and to the QA environment ready for testing. The UAT domain is set up, user IDs still need to be assigned to this environment. AC2 code still pending. Blocker with create new time record on the programs and services activity picker/filtering.
Sprint 8 Goal (7/2/25 – 7/15/25):
•Finalize AC2 code, team focus on the build (create new time record) completed and ready for QA testing, remediate issues with the programs and services activity picker.

Sprint 7 Goal (6/18/25 - 7/1/25):
•Finalize AC2 code, team focus on the build (login, create new time record, save time record, logout) completed and ready for QA testing. Set up UAT domain and ensure it can be accessed with a test ID.
•Actual: Login with selecting a database and logout are completed and to the QA environment ready for testing. The UAT domain is set up, user IDs still need to be assigned to this environment. AC2 code still pending. Blocker with create new time record on the programs and services activity picker/filtering.
Sprint 8 Goal (7/2/25 – 7/15/25):
•Finalize AC2 code, team focus on the build (create new time record) completed and ready for QA testing, remediate issues with the programs and services activity picker.

-
Sprint Review 6
Share Sprint Review 6 on Facebook Share Sprint Review 6 on X (formerly Twitter) Share Sprint Review 6 on Linkedin Email Sprint Review 6 linkSprint 6 Goal (6/4/25 – 6/17/25):
Save a complete time record in the QA environment. Finalize AC2 code and production domain/URL.
Actual: QA has blockers in this environment, AC2 code is still pending with escalation involved to push completion, production domain/URL has been determined by business leadership and signed off by communications (https://time.ssis.mn.gov)
Sprint 7 Goal (6/18/25 – 7/1/25):
Finalize AC2 code, team focus on the build (login, create new time record, save time record, logout) completed and ready for QA testing. Set up UAT domain and ensure it can be accessed with a test ID.

Sprint 6 Goal (6/4/25 – 6/17/25):
Save a complete time record in the QA environment. Finalize AC2 code and production domain/URL.
Actual: QA has blockers in this environment, AC2 code is still pending with escalation involved to push completion, production domain/URL has been determined by business leadership and signed off by communications (https://time.ssis.mn.gov)
Sprint 7 Goal (6/18/25 – 7/1/25):
Finalize AC2 code, team focus on the build (login, create new time record, save time record, logout) completed and ready for QA testing. Set up UAT domain and ensure it can be accessed with a test ID.

-
Help provide feedback on a mobile prototype of the Activity Log
Share Help provide feedback on a mobile prototype of the Activity Log on Facebook Share Help provide feedback on a mobile prototype of the Activity Log on X (formerly Twitter) Share Help provide feedback on a mobile prototype of the Activity Log on Linkedin Email Help provide feedback on a mobile prototype of the Activity Log linkThe Time Entry Transformation Team (TET) Product Team is currently building the New Time Entry experience that allows for mobile time/activity entries. Next, we’re looking to build the Activity Log experience that allows for mobile viewing and editing of previous entries – and we need your feedback to inform a prototype.
What’s involved?
1) Visit and explore the Activity Log mobile prototype
2) Answer 10 questionsDo you have to meet with someone?
No – it’s virtual and self-guided.How long will it take?
5-10 minutes – as little or as long as you can and want to dedicate to this.Ready to get started?
https://luae05zv.optimalworkshop.com/prototype/9f0a1cb00feb1b573919b42bf2e15fa1
note: Not everything in the prototype is functional. This is a no-code protype with placeholder data, and dropdowns may not contain all the information you’re familiar with.
The Time Entry Transformation Team (TET) Product Team is currently building the New Time Entry experience that allows for mobile time/activity entries. Next, we’re looking to build the Activity Log experience that allows for mobile viewing and editing of previous entries – and we need your feedback to inform a prototype.
What’s involved?
1) Visit and explore the Activity Log mobile prototype
2) Answer 10 questionsDo you have to meet with someone?
No – it’s virtual and self-guided.How long will it take?
5-10 minutes – as little or as long as you can and want to dedicate to this.Ready to get started?
https://luae05zv.optimalworkshop.com/prototype/9f0a1cb00feb1b573919b42bf2e15fa1
note: Not everything in the prototype is functional. This is a no-code protype with placeholder data, and dropdowns may not contain all the information you’re familiar with.
-
Contant/Activity Report
Share Contant/Activity Report on Facebook Share Contant/Activity Report on X (formerly Twitter) Share Contant/Activity Report on Linkedin Email Contant/Activity Report linkSurvey At-a-Glance
1. 269 surveys completed
2. 158 open ended responses/suggestions
3. 72.8% agree with the value and vision of the Time Entry Transformation project.
The following themes came back as topics of importance:
1. 73.7 are happy with the Time Entry Transformation Objectives and Key Results (OKRs)
2. 15 comments related to the speed of SSIS
3. Overall interested in reducing activity codes
Thank you for your continued partnership. We look forward to keeping you connected and informed throughout this exciting journey.
View the report: Survey_Responses_Report.pdf
Survey At-a-Glance
1. 269 surveys completed
2. 158 open ended responses/suggestions
3. 72.8% agree with the value and vision of the Time Entry Transformation project.
The following themes came back as topics of importance:
1. 73.7 are happy with the Time Entry Transformation Objectives and Key Results (OKRs)
2. 15 comments related to the speed of SSIS
3. Overall interested in reducing activity codes
Thank you for your continued partnership. We look forward to keeping you connected and informed throughout this exciting journey.
View the report: Survey_Responses_Report.pdf
-
Sprint Review 5
Share Sprint Review 5 on Facebook Share Sprint Review 5 on X (formerly Twitter) Share Sprint Review 5 on Linkedin Email Sprint Review 5 linkSprint 5 Goal (5/21/25 – 6/3/25):
•Focus on getting all MVP1 work to the QA environment. Finalize decision from ICAM for Oath, Entra, and Multi-Factor authentication. Get domains set up.
•Actual: Did not accomplish our goal but did make major progress on the front end, authentication is being escalated through management and our final domain name is being reviewed with communications.
Sprint 5 Goal (5/21/25 – 6/3/25):
•Focus on getting all MVP1 work to the QA environment. Finalize decision from ICAM for Oath, Entra, and Multi-Factor authentication. Get domains set up.
•Actual: Did not accomplish our goal but did make major progress on the front end, authentication is being escalated through management and our final domain name is being reviewed with communications.
-
Sprint Wins Spring 2025
Share Sprint Wins Spring 2025 on Facebook Share Sprint Wins Spring 2025 on X (formerly Twitter) Share Sprint Wins Spring 2025 on Linkedin Email Sprint Wins Spring 2025 link- Sprint Wins 2025
- CCM TET backlog organized with plans and timelines.
- All team members can record their own work and set up for scrum workflow processes with sprints.
- Project charter draft completed and under review.
- Project kick-off meeting with legal and additional consult lined up.
- Created team norms for conduct and communication with fully onboarded product team.
- New group email address set up for SSIS User Acceptance Testing {UAT) with TET.
- Presented early findings with user research, mobile design, and Minimum Viable Product (MVP) definition to key leadership team members.
- CCM TET backlog workflow in place and finalized byContinue reading
- Sprint Wins 2025
- CCM TET backlog organized with plans and timelines.
- All team members can record their own work and set up for scrum workflow processes with sprints.
- Project charter draft completed and under review.
- Project kick-off meeting with legal and additional consult lined up.
- Created team norms for conduct and communication with fully onboarded product team.
- New group email address set up for SSIS User Acceptance Testing {UAT) with TET.
- Presented early findings with user research, mobile design, and Minimum Viable Product (MVP) definition to key leadership team members.
- CCM TET backlog workflow in place and finalized by team.
- Project charter reviewed and approved by project sponsors.
- Held a follow-up meeting with legal on log-in screen disclaimer and warning messages.
- Worked on our product roadmap as a team.
- Presented to the TCM Systems Changes county-led workgroup on 5/28/25 with an update on EHQ, surveys, and a design to development walk-through.
- Closed Contact/Activity screen survey as of 5/30/2025, received 267 responses.
Time Entry Transformation Survey results as of 6/16/25:
269 surveys completed
158 open ended responses/suggestions
72.8% agree with the value and vision of the Time Entry Transformation project.
Successfully transitioned from Qualtrics to EHQ for the team's survey needs.
Project Charter approved by SSIS System Governance Group – effort advanced to Planning Phase.
Security Exception for Multi-Factor Authentication approved by the Enterprise Security Team – Risk closed.
Initial planning for User Acceptance, Functional and Accessibility testing underway
-
Sprint Review 4
Share Sprint Review 4 on Facebook Share Sprint Review 4 on X (formerly Twitter) Share Sprint Review 4 on Linkedin Email Sprint Review 4 linkOur sprint reviews are held internally with our key partners, and we want to share our progress with all of you as we kick off development work and build together with local agency workers.
Sprint 4 Progress (5/7/25 - 5/20/25):
Deliver critical security and design decisions by remediating authentication risks, establish stable UAT and QA environments, implement the foundational UI design including the landing page, and enable users to create a new time record via the front-end, ready for functional and usability testing.
Sprint 5 Goal (5/21/25 - 6/3/25):
ICAM for Oath, Entra, and Multi-Factor authentication. Get domains set up .
Focus on getting all MVP work to the QA environment. Finalize decisions.
Our sprint reviews are held internally with our key partners, and we want to share our progress with all of you as we kick off development work and build together with local agency workers.
Sprint 4 Progress (5/7/25 - 5/20/25):
Deliver critical security and design decisions by remediating authentication risks, establish stable UAT and QA environments, implement the foundational UI design including the landing page, and enable users to create a new time record via the front-end, ready for functional and usability testing.
Sprint 5 Goal (5/21/25 - 6/3/25):
ICAM for Oath, Entra, and Multi-Factor authentication. Get domains set up .
Focus on getting all MVP work to the QA environment. Finalize decisions.
-
Sprint Review 3
Share Sprint Review 3 on Facebook Share Sprint Review 3 on X (formerly Twitter) Share Sprint Review 3 on Linkedin Email Sprint Review 3 linkSprint 3 Review (4/23/25 - 5/6/25)
Thank you for reading our Sprint 3 review for the Time Entry Transformation web application! This new tool is being developed to give county and Tribal Nation case workers mobile access to enter time records-an improvement to access that will work alongside the current desktop SSIS system. During this sprint, we focused on finalizing key authentication and security components, defining what our first version minimum viable product (MVPl) will include, and welcoming a new front-end developer to the team, allowing us to move forward with full development support. MVPl will allow users to create new time records on mobile or desktop, with responsive design and better accessibility. We're also aiming for a smoother login process, reduced lag, and improved system stability.
Looking ahead to Sprint 4, we're focused on setting up stable testing environments and building the main user interface, including a new landing page. We'll also start preparing the app for usability and functional testing, including user acceptance testing (UAT) with a small group of local agency users. Interested In helping us test and pilot the new contact activity recording solution? Sign up through this link! Training materials will begin rolling out ahead of our targeted MVP release in Summer 2025. Feedback from users continues to guide our decisions, and we welcome your thoughts throughout this process. We hope to have frontend development updates to show everyone in the coming sprints as our team moves from the crawl to walk phase in our Crawl-Walk-Run approach.
Current SSIS Contact/ Activity Screen --> Low-Fidelity Prototype for New Activity/Time Entry --> Developed Mobile New Time Entry

Sprint 3 Review (4/23/25 - 5/6/25)
Thank you for reading our Sprint 3 review for the Time Entry Transformation web application! This new tool is being developed to give county and Tribal Nation case workers mobile access to enter time records-an improvement to access that will work alongside the current desktop SSIS system. During this sprint, we focused on finalizing key authentication and security components, defining what our first version minimum viable product (MVPl) will include, and welcoming a new front-end developer to the team, allowing us to move forward with full development support. MVPl will allow users to create new time records on mobile or desktop, with responsive design and better accessibility. We're also aiming for a smoother login process, reduced lag, and improved system stability.
Looking ahead to Sprint 4, we're focused on setting up stable testing environments and building the main user interface, including a new landing page. We'll also start preparing the app for usability and functional testing, including user acceptance testing (UAT) with a small group of local agency users. Interested In helping us test and pilot the new contact activity recording solution? Sign up through this link! Training materials will begin rolling out ahead of our targeted MVP release in Summer 2025. Feedback from users continues to guide our decisions, and we welcome your thoughts throughout this process. We hope to have frontend development updates to show everyone in the coming sprints as our team moves from the crawl to walk phase in our Crawl-Walk-Run approach.
Current SSIS Contact/ Activity Screen --> Low-Fidelity Prototype for New Activity/Time Entry --> Developed Mobile New Time Entry

-
Sprint Review 2
Share Sprint Review 2 on Facebook Share Sprint Review 2 on X (formerly Twitter) Share Sprint Review 2 on Linkedin Email Sprint Review 2 linkOur sprint reviews are held internally with our key partners, and we want to share our progress with all of you as we kick off development work and build together with local agency workers.
Sprint 2 Plans (4/9/25 – 4/22/25)
The sprint focused on:
Adding a project manager/scrum master team member to help with resource alignment and capacity planning.
Further development discoveries to refine the Minimum Viable Product (MVP).
Enhancing authentication & security solutions for user protection.
User-centered design improvements based on caseworker feedback.
Statewide feedback gathering on service activities & mobile use.
Launching surveys to broaden participation in design decisions.
Roadmap & Key Milestones
The planned feature rollout includes:
Summer 2025: First MVP release, allowing case workers to enter new time records via the web-based system that integrates with the existing SSIS application and databases.
Multi-factor authentication will likely be introduced for secure access, exploring options for password reset and forgot username.
User Input & Engagement
The team emphasizes user-driven design, actively seeking feedback through:
Meetings, chat discussions, and direct outreach with key partners and local agency workers.
Service activity code review using a Mural Board.
Qualtrics survey on mobile use and device availability to collect further feedback.
Key Takeaway
This product is designed with case workers in mind, making time entry simpler, mobile-friendly, and more efficient. The team values user input and is working toward a modernized solution that meets real-world needs. By reducing time spent on system inputs, workers can spend more time directly serving children and families.
Our sprint reviews are held internally with our key partners, and we want to share our progress with all of you as we kick off development work and build together with local agency workers.
Sprint 2 Plans (4/9/25 – 4/22/25)
The sprint focused on:
Adding a project manager/scrum master team member to help with resource alignment and capacity planning.
Further development discoveries to refine the Minimum Viable Product (MVP).
Enhancing authentication & security solutions for user protection.
User-centered design improvements based on caseworker feedback.
Statewide feedback gathering on service activities & mobile use.
Launching surveys to broaden participation in design decisions.
Roadmap & Key Milestones
The planned feature rollout includes:
Summer 2025: First MVP release, allowing case workers to enter new time records via the web-based system that integrates with the existing SSIS application and databases.
Multi-factor authentication will likely be introduced for secure access, exploring options for password reset and forgot username.
User Input & Engagement
The team emphasizes user-driven design, actively seeking feedback through:
Meetings, chat discussions, and direct outreach with key partners and local agency workers.
Service activity code review using a Mural Board.
Qualtrics survey on mobile use and device availability to collect further feedback.
Key Takeaway
This product is designed with case workers in mind, making time entry simpler, mobile-friendly, and more efficient. The team values user input and is working toward a modernized solution that meets real-world needs. By reducing time spent on system inputs, workers can spend more time directly serving children and families.
Training Videos
-
Click here to play video Introducing the Time Entry Web App A training video for Web app users.
-
Click here to play video Using the Activity Log In the second release of the Time Entry Web App, we changed the landing from the time entry screen to the new Activity Log. Here, you can open the time entry screen, as well as view and sort time records submitted through the web app or SSIS in a grid. You can also edit draft entries and entries submitted through the web app. Working with draft and submitted entries is covered in a separate video.
-
Click here to play video Drafts and Submitted Time Record In this video, we’ll cover the updates to the Time Entry Web App that allow you to create and edit draft time entries as well as editing entries submitted through the Web App. We’ll look at draft entries first, then editing entries submitted with the Web App.
Sprint Review and Usability Updates
-
Web App Update Statewide Roll Out
-
Web Update Round 2
-
Web App Update - Round 3
-
Minor Release 2.2.0
-
Sprint Review Updates
-
Sprint Review 21.pdf (128 KB) (pdf)
-
Sprint Review 13
-
Sprint Review 25 Final Sprint Review
-
Sprint Review 16
-
Sprint Review 15
-
Sprint Review 14
-
Sprint Review 12
-
Sprint Review 11
-
Sprint wins July 2025
-
Sprint Review 10
-
Sprint Review 9
-
Spint Review 8
-
Sprint Review 7
-
Sprint Wins Spring 2025
-
Sprint Review 6
-
Sprint Review 5
-
Sprint Review 4
-
Sprint Review 3
-
Sprint Review 2
-
Sprint Kickoff
-
-
Drafts and Autosave Coming Soon
-
Help provide feedback on Mobile Prototype
Custom
Who's Listening
-
SSIS Business Operations Supervisor
Email erica.jepson@state.mn.us -
Child Welfare Subject Matter Expert
Project Timeline
-
February → March 2025
-
March → April 2025
-
May → July 2025
-
August → September 2025
-
September → October 2025
-
November 01 → December 31 2025
FAQs
- What is Time Entry Transformation?
- Why is Time Entry Transformation important?
- How will I be impacted by the Time Entry Transformation effort?
- When will the new Time Entry Transformation web app be available?
- How can I learn more?
- How can I provide feedback?
- Why can’t I copy/paste my notes into the Note field from an application like Microsoft OneNote?
Related projects
News Categories
- #Sprint Review #Update (6)
- #SprintReview (1)
- #SprintReviewUpdate (1)
- #SprintWins (1)
- #autosave (1)
- #launch (1)
- #reportoffindings (1)
- #sprintreview (8)
- #sprintwins (1)
- #survey (1)
- #training (2)
- #update (7)
- #webappupdate (1)